Project Overview
This project consisted of the construction of a new 140′ x 240′ pre-engineered Chief Building serving as a comprehensive maintenance and operations facility for the County Highway Department. The facility includes a fully equipped maintenance shop with a 10-ton overhead crane and 66,000-pound parallelogram lift, along with dedicated areas for sign fabrication and storage, vehicle washing, motor grader and truck storage, soils and garage laboratories, parts storage, and administrative offices. Designed to support daily fleet maintenance, roadway operations, and administrative functions, the facility provides a centralized, efficient, and durable workspace for county transportation services.
Project Details
Project Gallery