Main Navigation

(320) 839-2529
Back to Projects

Education

Deuel School District

Clear Lake, SD

Project Overview

This project involved a combination of demolition, renovation, and new construction at the existing school. Due to the need to maintain a fully operation education environment throughout construction, the project was executed using a carefully planned phased approach. Construction activities were sequenced to minimize disruptions to students, faculty, and daily school operations while maintaining safe access throughout the facility. New additions were constructed and occupied before certain existing areas were renovated or repurposed, allowing school functions to continue with limited interruption. The phased strategy required close coordination among the owner, administration, design team, and contractors to manage temporary relocations, utility tie-ins, site logistics, and safety measures. While this approach added complexity to scheduling and construction operations, it was instrumental in allowing the district to remain fully functional during the multi-year improvement effort.

Project Details

Project Size
36,925 SF Addition & 8,350 SF Renovation
Hasslen's Role
CMAR
Architect
CO-OP Architecture
Project Cost
$13.6 M
Completed
April 2024